-
Read Reviews
-
Finance from
11.9% APR
Representative
-
ULEZ
Compliant
1.0t Ecoboost Titanium Hatchback 5dr Petrol Manual Euro 6 (s/s) (100 Ps)
This Ford Fiesta available from County Garage has a 1.0 litre Petrol engine, Manual Gearbox and finished in the colour Magnetic.
- 17
- Price £8,850
-
£Call pm
Customise Finance
-
or
Reserve for
£99
(Refundable)
-
Fair Price
- Vehicle to Trade-in? Value Your Vehicle
- Take it on the Road Book a Test Drive
-
County Garage
01227 374939
Open Until 6:00pm.
- Compare Add to Compare
- Put it on Paper Print Vehicle
Key Detail
Essential information about this Fiesta.
-
30,663 mi
Current odometer mileage reading.
-
GC17EVM
2017
This Fiesta was first registered in July 2017.
-
Manual
Manual transmission.
-
1.0l Petrol
The 999cc engine produces 0lbs of torque.
-
Magnetic
This vehicle is finished in Magnetic
Explore the Features
- Audio and Communications
- Drivers Assistance
- Exterior
- Interior
- Safety and Security
- Illumination
- Interior
- Exterior
- Safety and Security
-
- 16in Alloy Wheels - 10 Spoke
- Chrome Belt Line Finisher
- Chrome Upper Grille
- Door Handles - Body Colour
- Electrically-Operated Front Windows with One Touch Drivers
- Front Bumper - Body Colour
- Power Folding Door Mirrors with Puddle Lights
- Quickclear Heated Windscreen
- Rear Bumper - Body Coloured Upper and Self Colour Lower
- Rear Fog Lamps
- Rear Privacy Glass
- Rear Spoiler - Body Colour
- Tyre Repair Kit
-
- 3-Spoke Leather Trimmed Steering Wheel with Audio Controls
- Air Conditioning - Electronic Automatic Temperature Control - EATC
- Automatic Rain Sensing Wipers and Auto-Dimming Rear View Mirror
- Centre Console with Armrest and Illuminated Cupholders
- Courtesy Light - Ambient LED Courtesy Lighting
- Courtesy Light - Front Map Light and Rear - Overhead LED
- Door Lever - Chrome Finish
- Drivers Seat Lumbar Support
- Floor Mats - Front and Rear - Velour
- Gearshift Knob - Leather-Trimmed
- Glovebox - Illuminated
- Headliner - Woven
- Leather-Trimmed Handbrake
- Manual Drivers Seat Height Adjustment
- MyKey
- Overhead Console - Sunglasses Holder
- Rear Seat - 60-40 Split Back and Cushion
- Seats - Front Comfort Style
- Steering Column - Rake and Reach Adjustment
- Warning Triangle Storage
-
- 4.2in TFT Instrument Cluster Screen
- Ford Navigation System with Ford SYNC 3 - Apple CarPlay and Android Auto
-
- ABS - Anti-lock Braking System
- Airbags - Driver
- Airbags - Front Passenger
- Airbags - Front and Rear Side Curtain
- Airbags - Side Curtain
- Airbags - Side Impact
- EBD - Electronic Brakeforce Distribution
- Electronic Stability Control - ESC with Traction Control and Emergency Brake Assist - EBA
- Electronic Stability Programme - ESP with Hill Start Assist
- Ford Easy Fuel System
- IPS - Intelligent Protection System
- NCAP Pack
- Remote Central Locking and Engine Immobiliser
- Tailgate Wash-Wipe
- Thatcham Alarm
-
- Cruise Control
- Driver Alert
- TSR - Traffic Sign Recognition
- Trip Computer
- Tyre Pressure Monitoring System - TPMS
-
- Front Fog Lamps with Cornering Lights
- Headlights - Automatic High Beam Assist
- Headlights - Automatic On-Off and Highbeam
- Headlights - Halogen Projector with Black Bezel and Dedicated LED Daytime Running Lights
- Rear Lights - LED Night Signature
-
- Power Steering
All specifications are provided by a third party in good faith, mileage and prices are subject to change, please contact us to confirm all details before travelling or a purchase is agreed.
Every Detail Matters
Explore the key measurements and technical data for this vehicle.
-
0 mm -
0 mm -
0 mm
-
Dimensions
- Length4,040 mm
- Height1,476 mm
- Width1,941 mm
-
Weights & Capacities
- Number of Seats5
- Gross Vehicle Weight~
- Fuel Tank Capacity~
- Boot Capacity (Seats Up / Down)303 l / ~
- Kerb Weight~
- Battery Capacity (Usable)~
- Battery Range~
-
Performance
- Engine Power ps / bhp~ / 99.0 bhp
- Engine CC999
- 0-62 mph10.5 secs
- Top Speed113 mph
- Torque lbs / nm~ / ~
- Tax per year£200*
- * If the list price of a car is over £40,000, then an extra £425 will be payable from the second time the vehicle is taxed for up to 5 years
Transparent Pricing
Finance options and figures explained in full.
-
What is PCP?Personal Contract Purchase ExplainedWhat is HP?Hire Purchase Explained
County Garage (Sales) Limited T/as County Garage Ford is authorised and regulated by the Financial Conduct Authority (Ref No 673441) for consumer credit purposes. We are a broker for finance and not a lender.
-
PCP Customise Finance
- Finance Product x
- Vehicle Price x
- Retailer Deposit x
- Manufacturer Deposit x
- Customer Deposit x
- VAT Payable with Deposit x
- Total Deposit x
- x x
- Optional Final Payment x
- Balance to Finance x
- Total Charge For Credit x
- Total Amount Payable x
- Duration Of Agreement x
- APR x
- Interest Rate (Fixed) x
- Mileage per annum x
- Excess Mileage Charge x
-
HP Customise Finance
- Finance Product x
- Vehicle Price x
- Retailer Deposit x
- Manufacturer Deposit x
- Customer Deposit x
- VAT Payable with Deposit x
- Total Deposit x
- x x
- Balance to Finance x
- Total Charge For Credit x
- Total Amount Payable x
- Duration Of Agreement x
- APR x
- Interest Rate (Fixed) x
- Price £8,850
-
Customise Finance
£Call
Per month
Please Wait
This won't take a moment...
Customise Finance
Adjust values to personalise your finance quote.
- PCP
- HP
-
PCP
£Call
Per month
- Finance Product x
- Vehicle Price x
- Retailer Deposit x
- Manufacturer Deposit x
- Customer Deposit x
- Total Deposit x
- x x
- Optional Final Payment x
- Balance to Finance x
- Total Charge For Credit x
- Total Amount Payable x
- Duration Of Agreement x
- APR x
- Interest Rate (Fixed) x
- Mileage per annum x
- Excess Mileage Charge x
County Garage (Sales) Limited T/as County Garage Ford is authorised and regulated by the Financial Conduct Authority (Ref No 673441) for consumer credit purposes. We are a broker for finance and not a lender.
-
HP
£Call
Per month
- Finance Product x
- Vehicle Price x
- Retailer Deposit x
- Manufacturer Deposit x
- Customer Deposit x
- Total Deposit x
- x x
- Final Payment x
- Balance to Finance x
- Total Charge For Credit x
- Total Amount Payable x
- Duration Of Agreement x
- APR x
- Interest Rate (Fixed) x
- Mileage per annum x
- Excess Mileage Charge x
Please Wait
This won't take a moment...
Please Wait
This won't take a moment...

























































































































